MENU
051 831 500

The 5 main reasons for replacing a Dock Leveller:

1. It no longer suits your loading requirements – We offer bay lifts which allow for ground floor loading.

2. It’s a manual dock leveller – Although cost effective and suitable on some bays, a dock leveller operated by an electrical control panel is more efficient on busier loading bays.

3. It’s broken! – Obvious one really..

4. Updating your loading bay – Changing business needs and keeping your loading bay up to date will enable you to cope with the diversity of requirements placed on a modern loading bay.

5. Safety – Top reason for replacing any piece of loading bay equipment.

Ellickson Engineering can offer a solution on all aspects of your loading bay refurbishment.

Ellickson Engineering Manufacture Dock Levellers in our factory in Waterford and therefore can turn around dock levellers in short lead times. We can manufacture dock levellers to fit existing pouring trays from other manufacturers also.

 

Reconditioning your existing loading bays can offer a considerable saving

  • Increased safety
  • Improved appearance
  • Customer confidence
  • Professional look
  • Value added asset
  • Energy savings
  • Lower maintenance costs
  • Improved products

Talk to the Experts

Got a Project in Mind?

Get in touch today and let us know what you have in mind - everything is possible.

Need an Engineer?

24 hours Service Call Out

Get in touch today and let us know how our team can help you - everything is possible.

Ellickson - Certified Rite Hite Distributor

Rite‐Hite Equipment, Spare Parts and Product Support It is with great pleasure we announc…

Bespoke Engineering Soution

Another Bespoke Engineering Solution (Indoor) for a warehouse Client. Designed in-house and …

Engineering Solution for Pharmaceutical client

Another Bespoke Engineering Solution. A solution for a Pharmaceutical client designed by Kev…

Ellickson Engineering Autodock System

Ellickson Engineering Autodock System Product Advert HD Ellickson Engi…

Mount Sion CBS Secondary School

Sincerest thanks are in order for Ellickson Engineering for their sterling work on our Yards…